Kategoriarkiv: Aktuelt

ISRM Specialized Conference 2016: 7th International Symposium on In-Situ Rock Stress

May 10-12, 2016, Tampere, Finland

This symposium encompasses all aspects of rock stresses such as

  • Rock stress measurements with different methods (17 accepted abstracts)
  • Interpretation and analysis of results (16 accepted abstracts)
  • Case studies (nuclear waste disposal, mining, civil engineering) (18 accepted abstracts)
  • Regional stress fields (8 accepted abstracts)
  • Seismicity and rock stress (15 accepted abstracts)
  • New, innovated stress measurement methods (7 accepted abstracts)
  • Rock structures and rock stress (8 accepted abstracts)
  • Stress modeling (10 accepted abstracts)

For more information visit the website:

http://www.ril.fi/en/events/rs2016/home.html

RS16_26October_2015

Tunnelboremaskinen som skal drive Nye Ulriken tunnel bygges opp ved Arna utenfor Bergen

Photo 09-09-15 14 52 40

Foto og tekst av Øyvind Dammyr

Gripper TBMen har en diameter (Ø) på 9.33 meter, er 155 meter lang inklusive bakriggen og bruker 19″ kuttere. Det er første gang en TBM blir brukt til å drive en jernbanetunnel i Norge. Sist det var TBM drift i Bergens området var det «Madam Felle» som drev veitunnelene Fløyfjelltunnelen (1984-1986, Ø7.8 meter) og  Eidsvåg tunnelen (1987, Ø8.5 meter).